Maintenance schedule is important for best results, safe operation, and long service life.
| Location |
Inspection |
Incidence |
Activity |
| working rollers |
condition |
8 hours |
replace if worn |
air treatment unit |
cleaning |
40 hours |
release condensed water |
| table lifting chain |
tension |
300 hours |
if needed, tighten |
| belts |
tension and condition |
200 hours |
tighten, replace if worn |
| conveyor |
tension |
300 hours |
if needed tighten |
| table lifting bolt |
lubrication |
1 year |
grease |
Check regularly at least every two weeks the function of emergency and safety devices.
Push buttons of emergency locking. Press the button while the machine is running. It should stop in a few seconds.
End limit switches of belt position. Incapacitate door switches by the locked switch in the electrical box (see Chapter 2.2. i). Loosen sanding belts tension and depress push-button "Start" on the control panel. It may not light up.
Remove the sanding belt and the belt tension controller (simulation of belt breakage situation). Depress push-button "Start" on the control panel. It may not light up.
Remeber to activate door switches!
Door switches. While the machine is running, open the door. The machine must stop in a few seconds.
Gate at the input to the loading conveyor. While the machine is running fold the gate down. The conveyor must stop.
Table position end limit switches. task a helper to depress the push-button for adjusting the table elevation, and depress the end limit switch in the direction of table movement. The table must stop. Repeat in the opposite direction. Remeber to reactivate door switches.
Check every six months the gauge of brake lining. Let professional service replace lining if necessary.
Inspection of emergency and safety device may be done only by a trained worker well acquainted with the machine.
Should a defect be discovered, the machine must be laid up until the defect has been rectified.
For repair use service authorized by the manufacturer.
SERVICE